Relocation and New Construction Project of the First Affiliated Hospital of Tianjin University of Traditional Chinese Medicine

  • Location                                 Tianjin

  • Design/ Completion Date       2010 / 2015
  • Site Area                                 123500㎡
  • Floor Area                                 177049㎡
  • Height of Main Building          98.30m

  • Third Prize of National Excellent Engineering Survey and Design Industry Award in the Category of Public Building of Architectural Engineering
  • Second Prize of Tianjin Excellent Survey and Design Award in Architectural Engineering Category
  • National Quality Engineering Award